From factory to garden

A calmer way to add space.

The room is designed as a product, resolved for your site, made off site and delivered with far less disruption to your home.

Axonometric diagram of Backyard rooms added to a garden
Additive room system Concept design · not for construction

01 / One system, many rooms

Begin with one. Add as many as your life and site allow.

A studio, secondary dwelling, sauna, gym, tea room or reading room can stand alone. Adjoining rooms meet along a common façade and roof datum, allowing the collection to grow without reading as a row of unrelated pods.

02 / The pathway

Five clear stages.

We separate the decisions that belong to the product from those that must respond to your property.

  1. 01

    Choose

    Select your room, layout and material direction.

  2. 02

    Survey

    Confirm access, levels, services, planning and site constraints.

  3. 03

    Resolve

    Coordinate approvals, consultants, foundations and connections.

  4. 04

    Prefabricate

    Make and finish the room in a controlled factory environment.

  5. 05

    Deliver

    Prepare the site, place the room and complete final connections.

03 / Construction intent

A disciplined kit of parts, open to the people who will make it better.

The current design establishes spatial intent, a common datum and a proposed assembly logic. Structure, weatherproofing, transport, tolerances and installation sequencing will be developed with the selected manufacturer, engineers and fabricators.

Exploded architectural assembly showing roof, envelope, interior, floor and site layers

04 / Critical junctions

Resolve the few details that control everything else.

The roof edge, gutter, shade blade, glazing adaptor and front threshold set the visual quality of the system. These are design intents for review, not construction details.

Roof
Common front datum with concealed drainage logic
Façade
Timber structure behind a galvanised glazing adaptor
Threshold
Low floor build-up with optional concrete steppers or plinth
Site
Low-impact screw pile system, subject to engineering
Architectural section sketches of the roof edge and floor threshold

05 / Planning context

Victoria now has a clearer pathway for some small second dwellings.

Amendment VC253 introduced the small second dwelling land-use term in December 2023. The framework may simplify the planning pathway for some dwellings up to 60 m², but building approval, siting, access, services, overlays and other requirements still apply.

Outside Victoria, and for other room types, the relevant state and local requirements are assessed during the site review. Backyard does not assume that one approval pathway fits every property.

Victorian Government guidance
A family of Backyard rooms aligned in a landscaped garden

06 / What the site review considers

The room can be repeatable. The property never is.

Your site is the next layer.

Choose a room and start the review.